Evaluation of Load and Haulage Efficiency for Performance Enhancement: Pit A and Pit B of Mangal Cement Company, Iluhagba, Kogi State

  • Thomas Ayodele
  • Momoh M. Itopa Department of Metallurgical & Materials Engineering,Kogi State Polytechnic,Engineering Campus - Itakpe,PMB 1101,Kogi State.
  • Jethro M. Adebola
  • Dongo I. Enesi
  • Omananyi Samson
Keywords: Downtime, Productivity, Cement, Performance, Bioclassic

Abstract

The loading and hauling operations in mining and cement production are critical for ensuring the efficient movement of raw materials. The aim of this research is to critically evaluate the loading and hauling efficacy at the two mining pits at Managal cement quarry, Iluhagba and analyzing the operations for better performance. The research will also focus on evaluation of loading and hauling efficiency in two pits (Pit A and Pit B) at Mangal Cement Company. By identifying key performance indicators (KPIs), analyzing operational data, and implementing optimization strategies, to enhance overall operational performance, reduce costs, and improve productivity. A total cycle time approach was adopted to evaluate the efficacy of the equipment productivity and utilization rate approach was also adopted to evaluate the effectiveness of the machines. The methodology adopted for this project involved a combination of field measurements, observational studies, data collection from quarry records, and analytical techniques aimed at evaluating the performance of loading and haulage systems. The approach was designed to ensure accuracy, reliability, and practical relevance to the operational context of Manga Cement Quarry. The methodology adopted for this project involved a combination of field measurements, observational studies, data collection from quarry records, and analytical techniques aimed at evaluating the performance of loading and haulage systems. The approach was designed to ensure accuracy, reliability, and practical relevance to the operational context of Manga Cement Quarry. From the findings, it indicate that while a low rate often signals idle time due to maintenance downtime, operator unavailability, poor scheduling, or inefficient dispatching systems.

References

Andre, J. K.(2006).Shovel-Truck cycle Simulation Methods in Surface Mining, Master of Science in engineering, University of Witwatersrand, Unpublished,pp121. https://www.scribd.com/document/488887004/S-H-O-V-E-L-T-R-U-C-K

Choudhary, R.P. 2015. Optimization of load-and-haul mining systems by OEE and Match Factor for surface mining. International Journal of Applied Engineering and Technology, vol. 5, no. 2 (April-June). pp. 96-102.

Hardy, R. J., (2007): Selection Criteria for loading and hauling Equipment –Open Pit Mining Applications, Perth: Curtin University of Technology.

Mohammadi, M., Rai, R, and Gupta, S. (2015). Performance measurement of mining equipment. International Journal of Emerging Technology and Advanced Engineering, vol. 5, no. 7. pp. 240-248

Ogbeide, A. I. (2024). Impact of haulage transportation on service delivery: Evidence from Nigeria. Business and Economic Research, 14(3), Article 22141. doi:10.5296/ber.v14i3.22141

Patel, B., & Prajapati , J. (2012): Evaluation of bucket capacity, digging force calculations and static force analysis of mini hydraulic backhoe excavator, Machine Design,4 (1), 59-66

Sermin, E. and Birol, E. (2010).Performance Measurement of Mining Equipments by Utilizing OEE. Act Montanistica, vol 15, pp95-101.

George, B.; Nojabaei, B. (2023): Data Analyses of Quarry Operations and Maintenance Schedules: A Production Optimization Study. Mining 2023,3, 347–366. https://doi.org/10.3390/mining3020021

SME (2011): Mining Metallurgy & Exploration. https://www.smenet.org/professional-development/publications/mining-metallurgy-exploration

Salati L.K., Muhammad S.D., Adeyemo J,T. (2026): Simulation of Trucks Haulage Operation at Ashaka Cement Company in Gombe State, North-Eastern Nigeria. FUDMA Journal of Engineering and Technology. Vol. 2, Issue 1, Pp 356-366. https://fjet.fudutsinma.edu.ng/index.php/fjet/

Zhang, Y.; Zhao, Z.; Bi, L.; Wang, L.; Gu, Q. (2022): Determination of Truck–Shovel Configuration of Open-Pit Mine: A Simulation Method Based on Mathematical Model. Sustainability, 14, 12338. https://doi.org/10.3390/su141912338

Published
2026-09-21